Planned Preventative Maintenance (PPM) surveys are a crucial tool to enable building owners and Tenants to maintain the Building Fabric and Mechanical & Electrical installations proactively whilst managing and improving their commercial asset over a specific period of time.

PPM reports prepared by Roger Hannah are generally instructed to cover 5, 10, 15 or 20 years. We tailor our PPMs to reflect the client’s needs, assist with budget expenditure and deliver within an agreeable time frame.

Roger Hannah’s Planned Preventative Maintenance reports include the identification of defects, lifecycle predictions, budget costings and forecasts with recommended timescales over an agreed period of time that’s tailored to each individual client.

Prevention is better than cure and provides a more economical option!

 

Advantages of PPM

Improved Lifecycle: the main purpose for a PPM is to prolong the longevity of the Building Fabric and Mechanical & Electrical installations.    

Health & Safety: to be able to provide the safety and best environment to operate you need your Building Fabric and Mechanical & Electrical installations in the best possible condition.

Improved Scheduling: PPM is a more economical use of maintenance engineers times as they are able to work based on the scheduled plans of the preventative maintenance rather than a reactive basis.

Reduced Insurance Premiums: well-maintained fabric and equipment are generally considered safer.   

Prevention: due to the regular nature of PPMs they prevent the deterioration of the building fabric and M&E equipment therefore avoiding large scale/capital refurbishment schemes.

Value/Aesthetics: Well-maintained stock offering their best possible condition.

PPM within the Education Sector

Projects we’ve delivered for the Education Sector have included:

Roof Refurbishments | Boiler Upgrades | Fire Door Replacements | Fire Alarm Upgrades | Kitchen Refurbishments | Kitchen Extensions | School Extensions | Canteen Upgrades | LED Lighting Installations | Science Lab Refurbishments | Sports Facility Upgrades | Changing Room Refurbishments.

 

 

Key contacts

Neil O’Brien

BSc (Hons) MRICS IMAPS MPTS
  • Director

Steven Whittle

BSc (Hons) MSc MRICS
  • Director

James Rowcroft

BSc (Hons) MRICS
  • Associate Director

Phil O’Brien

BSc (Hons) MRICS
  • Associate Director

Case Studies

Manchester Crematorium PPM

Case Study: Manchester Crematorium PPM Client Type: Property Owner / Investor Location: Manchester Sector: Commercial Project: Roger Hannah’s Building Consultancy…

Manchester High School for Girls (MHSG)

Case Study: Manchester High School for Girls (MHSG) PPM Client Type:  Private School / Education Provider Location: Manchester Sector: Education…